On site things have started going up instead of coming down!

In January the the foundations for the new extension were formed and the concrete floor slab poured. We now have the steelwork erected and you can seen the basic form of the extension.

The new access to the first floor has been created and the old doorway infilled. It has been very cold on site but we can get an idea of how the morning sunlight will filter in over the new staircase into the dining area.